The work is going very smooth, without major challenges.
We have finished the ground floor completely with the concrete slab,
The second floor is almost completed, walls and columns are finished and the formwork for the second and last slab is ready. We hope to cast the slab in the next week.
The contractor is also advanced with the plaster of the ground floor, windows and doors are made, ready to be fixed, 126 beds in 70% done.